Hough End tram stop

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Hough End
Metrolink
Location
Place Chorlton-cum-Hardy
Local authority City of Manchester
Fare zone information
Present status Proposed station
History
Opening N/A
WikiProject UK Trams Banner.jpg UK Trams portal

Hough End tram stop was a proposed tram stop on the phase 3b plans to Manchester Airport. It was originally due to open in 2016 but was dropped from the plans.

References

  • https://web.archive.org/web/20110716213530/http://www.tfgm.com/pdfmaps/metrolink_phase3.pdf
Preceding station   Manchester metrolink logo.PNG Manchester Metrolink   Following station
  Under Construction  
Manchester Airport Line
towards Chorlton

Coordinates: 53°26′15″N 2°15′44″W / 53.4376°N 2.2621°W / 53.4376; -2.2621


Retrieved from "https://en.wikipedia.org/w/index.php?title=Hough_End_tram_stop&oldid=778266449"
This content was retrieved from Wikipedia : http://en.wikipedia.org/wiki/Hough_End_tram_stop
This page is based on the copyrighted Wikipedia article "Hough End tram stop"; it is used under the Creative Commons Attribution-ShareAlike 3.0 Unported License (CC-BY-SA). You may redistribute it, verbatim or modified, providing that you comply with the terms of the CC-BY-SA